Comment (0)

Post Comment

5 + 6 =
Post
Disclaimer: Comments will be moderated by Jagranjosh editorial team. Comments that are abusive, personal, incendiary or irrelevant will not be published. Please use a genuine email ID and provide your name, to avoid rejection.

    List of upcoming expressways in India

    Through this article, let us have a look at the top 10 upcoming expressways in India.
    Created On: Oct 13, 2021 18:06 IST
    Modified On: Oct 14, 2021 12:13 IST
    List of upcoming expressways in India
    List of upcoming expressways in India

    Expressways in India are controlled-access highways meaning that a vehicle can enter only through a limited place and no other road merges with or crosses the expressway anywhere to avoid any possible accidents. They consist of access ramps, grade separation, lane dividers and elevated sections. Through this article, let us have a look at the top 10 upcoming expressways in India. 

    Delhi-Mumbai Expressway 

    1- Delhi-Mumbai Expressway is an under-construction eight-lane access-controlled expressway that will connect the country’s National Capital, Delhi, with the Financial Capital, Mumbai. 

    2- Once completed, it will be the world’s longest expressway-- 1380 km long. 

    3- The expressway will reduce the travel time by 12 hours from the earlier 24 hours. 

    4- It will house the country’s first-ever animal overpass on the lines of European nations.

    5-  The expressway passes through the states of Madhya Pradesh (370 km), Gujarat (300 km), Haryana (80 km), Rajasthan (380 km) and Maharashtra (120 km). It will have its north end in Delhi and south end in Mumbai.

    Jagranjosh

    Image Credit: Drishti IAS

    Total Estimated Cost: Rs. 1 lakh crores

    Length: 1380 km

    Lanes: 8 lanes

    Status: Under Construction

    Completion Deadline: 2022 in 51 packages

    Read more on Delhi-Mumbai Expressway: Delhi-Mumbai Expressway: Here's all you need to know about 8 lane greenfield expressway

    Dwarka Expressway 

    1- Dwarka Expressway is an under-construction eight-lane access-controlled expressway that will connect Delhi’s Mahipalpur to Haryana's Kherki Daula Toll Plaza.

    2- It is India’s first-ever elevated urban expressway. 

    3- The expressway will have a fully automated tolling system with 22 lanes toll plaza. 

    4- The upcoming Dwarka Expressway will decongest the NH-8 which is used by nearly 3 lakh passengers every day, 

    5- The Dwarka Expressway will house an Intelligent Transportation System which will provide real-time information related to travel time, travel speed, delays, accidents on roads, change in routes, diversions, work zone conditions, etc. 

    Jagranjosh

    Image Credit: The Metro Rail Guy

    Total Estimated Cost: Rs. 8,662 crore

    Length: 29.10 km

    Lanes: 8 lanes + local lanes 

    Status: Under Construction

    Completion Deadline: 2022 in 4 packages

    Read more on Dwarka Expressway: All about India's first Elevated Urban Expressway connecting Delhi and Gurugram

    Purvanchal Expressway 

    1- Purvanchal Expressway is an under-construction access-controlled expressway in Uttar Pradesh that will connect Chand Sarai village in Lucknow with Haydaria village on NH-31 in Ghazipur.

    2- The Purvanchal Expressway will boost the development of the region as well as the state. 

    3- Industrial training institutes, educational institutes, medical institutes, new townships and so forth will be set up near the Expressway areas which in turn will generate employment opportunities in the region. 

    4- The yet to be completed expressway will be connected to the existing Agra-Lucknow Expressway, thereby becoming a vast industrial corridor connecting the Eastern and Western boundaries leading to the overall development of the state. 

    5- Agriculture, commerce, tourism, and other industrial development will get a major fillip with the completion of the Purvanchal Expressway.

    Jagranjosh

    Image Credit: India TV News

    Total Estimated Cost: Rs. 22,494.66 crore

    Length: 340.824 km

    Lanes: 6 lanes 

    Status: Under Construction

    Completion Deadline: October 2021 in 8 packages

    Read more on Purvanchal Expressway: The Purvanchal Expressway

    Mumbai-Nagpur Expressway

    1- Officially known as Hindu Hruday Samrat Balasaheb Thackeray Maharashtra Samruddhi Mahamarg, Mumbai-Nagpur Expressway is an under-construction access-controlled expressway in Maharashtra.

    2- The expressway will connect two capitals of Maharashtra-- Nagpur and Mumbai.

    3- It is among the longest greenfield road projects in India. 

    4- The expressway will traverse through 10 main districts of Maharashtra-- Nagpur, Wardha, Amravati, Washim, Buldhana, Jalna, Aurangabad, Nashik, Ahmednagar and Thane.

    5- The Nagpur-Mumbai Expressway will connect India’s largest container port JNPT Mumbai to MIHAN in Nagpur. It will widely connect  Delhi-Mumbai Industrial Corridor, Bengaluru-Chennai Economic Corridor, Western Dedicated Freight Corridor, Eastern Dedicated Freight Corridor, Chennai Vizag Economic Corridor and Golden Quadrilateral. 

    Jagranjosh

    Image Credit: Financial Express

    Total Estimated Cost: Rs. 55,000 crore

    Length: 701 km

    Lanes: 6 lanes 

    Status: Under Construction

    Completion Deadline: December 2021 in 16 packages

    Read more on Mumbai-Nagpur Expressway: Maharashtra Samruddhi Mahamarg – Maharashtra Samruddhi Mahamarg

    Ganga Expressway 

    1- Ganga Expressway is an approved six-lane access-controlled expressway in Uttar Pradesh.

    2- The project will connect NH-334 in Meerut District with NH-2 at Prayagraj (Allahabad) Bypass in Prayagraj District.

    3- The project is undertaken for the Omnidirectional development of the Indian state of Uttar Pradesh. 

    4- The Ganga Expressway will traverse through 12 districts of Uttar Pradesh-- Meerut, Hapur, Bulandshahar, Amroha, Sambhal, Badaun, Shahjahanpur, Hardoi, Unnao, Raebareli, Pratapgarh, and Prayagraj.

    5- In February 2021, the state government decided to extend the project on both ends-- from Meerut to Haridwar and from Prayagraj to Varanasi. However, a DPR has not yet been prepared. 

    Jagranjosh

    Total Estimated Cost: Rs. 40,000 crore

    Length: 594 km

    Lanes: 6

    Status: Land acquisition (82.04% complete as of July 11, 2021) and RFQ-RFP bidding underway

    Completion Deadline: Not Announced

    Read more on Ganga Expressway: Ganga Expressway

    Delhi-Amritsar-Katra Expressway 

    1- Delhi-Amritsar-Katra Expressway is a four-lane controlled-access expressway that will connect the Bahadurgarh border in Delhi with Katra in Jammu and Kashmir via Nakodar and Gurdaspur in Punjab.

    2- The upcoming expressway will reduce travel time from earlier 14 hours to 6 hours between Delhi-Katra and will reduce travel time from 8 hours to 4 hours between Delhi-Amritsar.

    3- It will also have a spur section that will connect Nakodar with Sri Guru Ram Dass Jee International Airport located in Raja Sansi, Amritsar.

    4- The project will promote religious tourism as the road will connect two important holy cities—Katra-Vaishno Devi and Amritsar.

    5- Delhi-Amritsar-Katra Expressway will house a trauma centre, ambulances, fire brigades, traffic police, bus bays, truck stops, interchanges with refreshments, and recreational facilities.

    Jagranjosh

    Image Credit: Times of India

    Total Estimated Cost: Rs. 35,000 crore

    Length: 634 km

    Lanes: 4

    Status: Under Construction

    Completion Deadline: 2023

    Read more on Delhi-Amritsar-Katra Expressway: Delhi-Amritsar-Katra Expressway

    Ahmedabad-Dholera Expressway

    1- Ahmedabad-Dholera Expressway is an under-construction four-lane access-controlled expressway in Gujarat. 

    2- Once completed, the expressway will connect Sardar Patel Ring Road near Sarkhej in Ahmedabad with Adhelai village in Bhavnagar district via Dholera Special Investment Region (Dholera SIR).

    3- The project is a part of the Delhi–Mumbai Industrial Corridor (DMIC).

    4- The proposed  Dholera International Airport will also lie on the route.

    5- The Ahmedabad-Dholera Expressway will traverse through two major cities of Gujarat-- Ahmedabad and Bhavnagar.

    Jagranjosh

    Image Credit: 

    Total Estimated Cost: Rs. 3,500 crores

    Project’s Total Length: 110 km

    Lanes: 4 

    Status: Under Construction

    Deadline: March 2023

    Read more on Ahmedabad-Dholera Expressway: Ahmedabad-Dholera Expressway

    Bangalore-Chennai Expressway 

    1- The Bangalore-Chennai Expressway is a four-lane under-construction access-controlled expressway that will connect Karnataka and Tamil Nadu. 

    2- The proposed expressway will connect Hoskote in Karnataka to Sriperumbudur in Tamil Nadu.

    3- On January 1, 2021, the expressway was designated as National Expressway 7 (NE-7). 

    4- The expressway will pass through Andhra Pradesh to connect Chennai to Bangalore. 

    5- The Bangalore-Chennai Expressway is being developed under the Bharatmala Pariyojana program.

    Jagranjosh

    Image Credit: Wikipedia

    Total Estimated Cost: Rs. 18,000 crores

    Project’s Total Length: 258 km

    Lanes: 4 

    Status: Under Construction

    Deadline: March 2023

    Read more on Bangalore-Chennai Expressway: Bangalore-Chennai Expressway

    Raipur-Visakhapatnam Expressway

    1- Also known as Nandi Infrastructure Corridor Enterprises Road, the Raipur-Visakhapatnam Expressway is an under-construction access-controlled six-lane expressway.

    2- The project has a route alignment through Chhattisgarh, Odisha and Andhra Pradesh.

    3- The Raipur-Visakhapatnam Expressway has been undertaken under the Bharatmala Pariyojana Phase-I program.

    4- The project is a part of the Raipur–Visakhapatnam Economic Corridor (EC-15). 

    5- The expressway passes through Raipur, Dhamtari, Kanker and Kondagaon district in Chhattisgarh, Nabarangpur and Koraput districts in Odisha, and Vizianagaram district in Andhra Pradesh.

    Jagranjosh

    Image Credit: Sky Scraper City

    Total Estimated Cost: Rs. 20,000 crores

    Project’s Total Length: 464 km

    Lanes: 6

    Status: Under Construction

    Deadline: 2025

    Read more on Raipur-Visakhapatnam Expressway: Raipur–Visakhapatnam Expressway

    Faridabad-Noida-Ghaziabad Expressway

    1- Faridabad–Noida–Ghaziabad Expressway is an under-construction six-lane expressway that will connect Haryana and Uttar Pradesh.

    2- The expressway will start from Faridabad in Haryana with Noida and Ghaziabad in Uttar Pradesh. 

    3- The expressway has been designed by IIT-Roorkee.

    4- A bridge is also planned from Noida's Sector 150 to National Highway 19 in Faridabad as a part of Faridabad–Noida–Ghaziabad Expressway.

    5- The expressway will traverse through four major cities of Haryana and Uttar Pradesh-- Faridabad, Ghaziabad, Noida and Greater Noida. 

    Jagranjosh

    Image Credit: USP Online

    Project’s Total Length: 56 km

    Lanes: 6

    Status: Under Construction

    Deadline: 2022

    Related Articles: 

    What is National Highway and Expressway in India?

    Delhi-Meerut Regional Rapid Transit System (Delhi-Meerut RRTS) project: Here's everything you need to know